Which product is this about?
Toggl Track
Topic content
I’ll often switch (in the real world) to a task I’ve done before, and after some time, realise Toggl Track needs updating. I’ll click an historic Toggl timer entry to start a timer for the current (real world) task, and then need to backdate the switchover time.
At present, I’ll open the previous entry, adjust its End Time, and click Save. Then open the running entry, and adjust its Start Time (to the same value) and click Save.
I did wonder if it was possible to adjust the time boundary of both entries simultaneously using the Calendar view, but vertically dragging the “==” symbol that appears on the border of each entry only affects that one entry, so you still have to edit both entries separately.
Is it possible to adjust both at once? I do this so often in the working day that halving the work involved would really help, and I’m surprised a way of doing this either doesn’t exist or isn’t apparent.
Am I missing something obvious? Thanks!
Using Windows Toggl Track Desktop 10.18.1 (64-bit).