# Track pomodoro breaks in same category as work sessions

**URL:** <https://community.toggl.com/t/track-pomodoro-breaks-in-same-category-as-work-sessions/1754>\
**Category:** Product Feedback\
**Tags:** tracking-time, pomodoro\
**Created:** [April 24, 2025, 1:08am UTC](https://community.toggl.com/t/track-pomodoro-breaks-in-same-category-as-work-sessions/1754 "2025-04-24T01:08:52Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![j-dean](https://yyz2.discourse-cdn.com/flex012/user_avatar/community.toggl.com/j-dean/32/1121_2.png) [@j-dean](https://community.toggl.com/u/j-dean)\
**Post date:** [April 24, 2025, 1:08am UTC](https://community.toggl.com/t/track-pomodoro-breaks-in-same-category-as-work-sessions/1754/1 "2025-04-24T01:08:52Z")

</div>

I often use the pomodoro feature in the windows desktop app to track my time. It works great, I just wish there was an option to track the pomodoro breaks in the same category as the working time.

The current behavior is that when “Preferences-\>Pomodoro-\>Track Breaks as Time Entries” is turned on, it logs a separate time entry labeled “pomodoro break” that is not linked to the same project as the working session. Then when I’m looking at my time reports, there is a significant chunk of time consisting of all the breaks that is not associated with a project. But for my billing, I would like to count two hours of work consisting of four work sessions and three breaks to all be included as billable hours.

 ![image](https://canada1.discourse-cdn.com/flex012/uploads/toggl1/original/2X/0/0aba2ccef2d80515cdedaa410825f48ee9915ebd.png)

It would be great if there was an option to have the breaks associated with the same project.  
Or if there’s a workaround anyone knows please let me know!
