It would be handy to be able to sort the entries in the project breakdown.
I want to be able to sort on either the first column or the Total column.
Sorting by the total lets me see where the most time has been spent. (Maybe I need to spend less time on something.)
Sorting by the first column lets me quickly locate the projects/tasks I need to review.