Although the detailed report currently shows duration and start time, it doesn’t show end time. This means that if I want to see at a glance how I spent my time for a given week on the detailed report, I have to add the duration to the start time, work out the end time, check if that matches the start time of the next listed task, etc. Is there any way that end time can be added to the report? An interface like the one on which we log our time would be great, especially since that is what we are most used to seeing and using
